Ready-mix truck feeding a concrete line pump on site

The short version

  • Delivery is charged on top of the per-m³ concrete rate.
  • Small pours attract a minimum-load or short-load fee, so tiny orders cost more per metre.
  • Ordering accurately and combining small pours keeps delivery costs down.

The price per cubic metre isn't the whole story — getting the concrete to your site costs money too, and for small jobs the delivery side can be a surprising share of the bill. Here's how concrete delivery is priced, why there's a minimum charge, and how to keep it in check.

Why there's a minimum load fee

A concrete truck has the same running cost whether it carries one cubic metre or a full load, so plants set a minimum load and add a short-load fee for orders below it. That fee spreads the cost of sending the truck out. On a small pour — say under a metre or two — it can add up to a big chunk of the total, which catches a lot of DIYers out.

Part-loads and how they're charged

Order less than a full truck and you're pouring a part-load: you pay for what you take plus the short-load fee. That's fine and normal for small jobs — just factor the fee in when you're comparing “bags vs ready-mix”. Often, once you're past roughly half a cubic metre, ready-mix delivered still beats hauling and mixing bags by hand.

How to keep delivery costs down

  • Order the right amount. Short-ordering means a second delivery (and a second fee); big over-ordering wastes concrete. Our calculator gets you close.
  • Combine small pours where you can, so one delivery covers more.
  • Have the site ready so the truck isn't waiting — standing time can cost extra.
  • Bundle supply and pump so you're not paying two separate call-outs.

Doing a small Melbourne pour? We can arrange the concrete supply and delivery and pump it in one booking — one price, no doubling up. Get a quote →

The takeaway

Delivery and minimum-load fees are a normal part of buying concrete, not a rip-off — they just reward ordering accurately and planning the pour. Work out your volume, avoid tiny repeat deliveries, and get supply and pump quoted together. For the concrete rate itself, see concrete price per m³ in Melbourne.

CGI Concrete Pump Melbourne
Written by CJ Iordanou
Co-owner & pump operator, CGI Concrete Pump Melbourne

CJ is one of the two brothers behind CGI Concrete Pump Melbourne. He's spent 15 years in concrete — on the tools laying it and now running the pumps — so these guides come from real Melbourne job sites, not a textbook.

Connect with CJ Iordanou on LinkedIn
Published 31 July 2026
How Much Concrete Do You Need & How Ordering Works
FAQ

Quick answers

Why is there a minimum charge on concrete delivery?
Batching plants charge a minimum (and often a short-load fee) because sending a truck out has fixed costs whether it carries 1 m³ or a full load. For small pours that fee can be a big share of the bill, so it's worth ordering accurately and, where practical, combining small pours.
How can I keep concrete delivery costs down?
Order the right volume (use our calculator), avoid tiny part-loads where you can, make sure the site is ready so the truck isn't waiting, and get supply and pump quoted together so there's no doubling up on call-outs.
Concrete pump hire FAQ

More questions about concrete pumping

Which parts of Melbourne and Victoria do you cover?
We hire concrete pumps right across metropolitan Melbourne and out into regional Victoria — including the Mornington Peninsula, Geelong, the Yarra Valley and the outer growth corridors. If you're not sure we reach your site, call us on 0412 845 415.
Can you supply the concrete as well as the pump?
Yes. We can arrange ready-mix supply and delivery alongside the pump so you deal with one team for the whole pour. See our concrete delivery page or ask for a combined quote.
How far ahead should I book a concrete pump?
For most residential jobs a few days' notice secures your preferred date; busy periods and larger commercial pours book out further ahead. The sooner you lock in the date the better — get in touch to check availability.
Do I need a line pump or a boom pump?
It depends on access and pour height. Line pumps suit tight residential sites and ground-level work; boom pumps reach over buildings and into hard-to-access areas. Our line pump vs boom pump guide breaks it down, or we can advise on a quick call.
What should I have ready on site before the pour?
Clear access for the truck, a water source for washout, formwork set and signed off, and enough crew to place and finish. We'll walk you through site setup when you book — see our hire rates for what's included.

Fast quotes · Melbourne & Victoria wide

Book a concrete pump that turns up on time

Tell us the site, the pour and the date. We'll come back with a straight price and a clean, reliable pump crew — line pump or boom, resi or commercial.

📍 Based Kilsyth South VIC — serving all of Melbourne & Victoria
✉
GET A QUOTE — 30 SECONDS