By CJ Iordanou · 31 Jul 2026
The short version
- MPa is concrete's compressive strength — higher MPa means stronger concrete and a higher price.
- 20 MPa suits paths and non-structural work; 25 MPa is a common house-slab and driveway mix; 32 MPa is for heavier structural and commercial slabs.
- Always pour to your engineering or council spec — going stronger than needed just costs more.
Ordering concrete and stuck on which strength to ask for? “MPa” is the number that decides it — and it changes both how your concrete performs and what it costs. Here's what 20, 25 and 32 MPa actually mean, which one suits your job, and how much the step-ups add.
What MPa means
MPa (megapascals) is the compressive strength concrete reaches once cured — how much load it can carry before it fails. A 25 MPa mix is stronger than 20 MPa; 32 MPa is stronger again. Strength comes mainly from the cement content and mix design, so a higher-MPa mix uses more of the expensive ingredient — which is why it costs more per cubic metre.
Which mix for which job
20 MPa — light-duty, non-structural work: garden paths, some footpaths and fill. The budget option where strength isn't critical.
25 MPa — the workhorse residential mix. Most house slabs, driveways and shed slabs are poured at 25 MPa (or as specified). Good strength, sensible price.
32 MPa — heavier structural and commercial slabs, suspended slabs and anything carrying serious load. Costs more, but it's what the engineering calls for on those jobs.
The golden rule: pour to the strength your plans, engineer or council require. Under-spec and you risk the slab; over-spec and you're just paying more for concrete you didn't need.
What the step-ups cost
Each jump in strength adds to the per-cubic-metre rate — modestly from 20 to 25, a little more again to 32. On a small slab the difference is minor; on a big pour it adds up, which is exactly why you don't want to over-order strength “to be safe”. For how the base rate is set, see our guides to concrete price per m³ in Melbourne and concrete cost per m³ in Australia.
Not sure which mix your slab needs? Tell us the job — we've poured all three for 15 years and can point you right. We can supply the right mix, deliver it and pump it. Get a quote →
Work out how much you need
Once you've settled the strength, size the pour with our concrete calculator so you order the right volume at the right MPa — the two decisions that set your bill.