Concrete slab formwork and base prep showing slab depth

The short version

  • Thickness depends on the load: paths thinner, driveways and house slabs thicker.
  • Common guides: paths ~75–100 mm, general/shed slabs ~100 mm, driveways ~100–150 mm.
  • Structural slabs are set by an engineer — always follow the design.
  • Thicker slabs need more concrete — check with the calculator.

Slab thickness is one of the first things to get right, because it decides both how the slab performs and how much concrete you'll order. Too thin and it cracks under load; thicker than needed and you're paying for concrete you didn't have to. Here's a plain guide to typical thicknesses — with the reminder that structural slabs follow the engineer, not a blog.

Typical thicknesses by job

  • Paths & light footpaths — often around 75–100 mm.
  • General & shed slabs — commonly 100 mm (thicker for heavy vehicles or machinery). See our shed slab guide.
  • Driveways — usually 100–150 mm depending on the vehicles.
  • House & structural slabs — set by engineering; can be thicker and more heavily reinforced.

These are general starting points, not a substitute for your plans. For anything structural, or where a council permit applies, the required thickness (and reinforcement) comes from the design.

Why thickness changes the cost

Concrete volume is length × width × thickness, so thickness scales your order directly. Going from 100 mm to 150 mm on the same slab is 50% more concrete — a real jump on a big pour. It's also why guessing thickness throws your budget out. Pop your dimensions into the concrete calculator and change the thickness to see the volume move.

Know your thickness, need it poured? We'll pump your slab and can supply the concrete at the right strength. Get a quote →

Don't forget the base and steel

Thickness works with the base prep and reinforcement — a well-compacted base and correctly placed steel mesh matter just as much as the number of millimetres. Get all three right and the slab will do its job for decades.

CGI Concrete Pump Melbourne
Written by CJ Iordanou
Co-owner & pump operator, CGI Concrete Pump Melbourne

CJ is one of the two brothers behind CGI Concrete Pump Melbourne. He's spent 15 years in concrete — on the tools laying it and now running the pumps — so these guides come from real Melbourne job sites, not a textbook.

Connect with CJ Iordanou on LinkedIn
Published 31 July 2026
How to Lay a Concrete Pad
FAQ

Quick answers

What is the minimum thickness for a concrete slab?
It depends on the load. Light-duty paths might be around 75–100 mm, general slabs and sheds commonly 100 mm, and driveways or heavier slabs 100–150 mm or more — with structural slabs set by an engineer. Always follow your engineering or council requirements for anything structural.
Does a thicker slab need more concrete?
Yes — volume is length × width × thickness, so going from 100 mm to 150 mm is 50% more concrete for the same area. Our concrete calculator lets you change the thickness and see the volume instantly.
Concrete pump hire FAQ

More questions about concrete pumping

Which parts of Melbourne and Victoria do you cover?
We hire concrete pumps right across metropolitan Melbourne and out into regional Victoria — including the Mornington Peninsula, Geelong, the Yarra Valley and the outer growth corridors. If you're not sure we reach your site, call us on 0412 845 415.
Can you supply the concrete as well as the pump?
Yes. We can arrange ready-mix supply and delivery alongside the pump so you deal with one team for the whole pour. See our concrete delivery page or ask for a combined quote.
How far ahead should I book a concrete pump?
For most residential jobs a few days' notice secures your preferred date; busy periods and larger commercial pours book out further ahead. The sooner you lock in the date the better — get in touch to check availability.
Do I need a line pump or a boom pump?
It depends on access and pour height. Line pumps suit tight residential sites and ground-level work; boom pumps reach over buildings and into hard-to-access areas. Our line pump vs boom pump guide breaks it down, or we can advise on a quick call.
What should I have ready on site before the pour?
Clear access for the truck, a water source for washout, formwork set and signed off, and enough crew to place and finish. We'll walk you through site setup when you book — see our hire rates for what's included.

Fast quotes · Melbourne & Victoria wide

Book a concrete pump that turns up on time

Tell us the site, the pour and the date. We'll come back with a straight price and a clean, reliable pump crew — line pump or boom, resi or commercial.

📍 Based Kilsyth South VIC — serving all of Melbourne & Victoria
✉
GET A QUOTE — 30 SECONDS