The short version
- Set out, prep and compact the base, form up, lay steel, order the right volume, then pour and cure.
- A shed slab is a realistic DIY job with good prep and enough hands.
- A line pump gets concrete into tight backyards without barrowing.
Laying a slab for a shed is one of the most satisfying DIY concrete jobs — and very doable if you respect the prep and the clock. Here's the step-by-step, Melbourne backyard edition.
1. Set out and excavate
Mark out the slab a little larger than the shed footprint, square it up, and excavate to depth. Aim for a level base at the right height, with a slight fall if you want water to shed off.
2. Base and compaction
Add crushed rock fill, spread it evenly and compact it well — a soft base is the number-one cause of a cracked shed slab. Check your levels as you go.
3. Formwork
Set timber forms to the slab's shape and finished height, braced with pegs so they won't bow when the concrete goes in. Double-check the diagonals are equal so it's square.
4. Steel and membrane
Lay a vapour barrier where required, then reinforcing mesh up on bar chairs so it sits within the slab. Lap and tie the sheets.
5. Order the concrete
Work out the volume with the concrete calculator, pick the right mix strength, and book delivery. For a backyard shed, book a line pump too — it saves your back and keeps the pour clean.
6. Pour, screed and finish
Place the concrete, screed it level, bull-float, then edge and finish once the bleed water's gone. Have enough hands so no area sits too long — the pump placing concrete exactly where you want it makes this far easier.
7. Cure it
Keep it moist and protected for the first days — see curing time before you build the shed on it.